Cameroon2016Technical-package studies (design phases)
Emergency Operations Control Centre — Yaoundé-Nsimalen airport
Contracting authority: EGIS-Cameroon
Context
Construction of an Emergency Operations Control Centre (basement + ground + 3 floors, 1,800 m²) at Yaoundé-Nsimalen international airport.
Assignment
Studies of the technical packages, design phases.
Results
Technical files delivered for a strategic airport facility.
Scope of engagement
Assignment led by XP-NOVA's founding expert within GEQUIPS SARL — an associate company of XP-NOVA (10% of capital) and technical partner bound by a support agreement.