XP-NOVA — Bureau d'Ingénierie Conseil
Cameroon2016Technical-package studies (design phases)

Emergency Operations Control Centre — Yaoundé-Nsimalen airport

Contracting authority: EGIS-Cameroon

Context

Construction of an Emergency Operations Control Centre (basement + ground + 3 floors, 1,800 m²) at Yaoundé-Nsimalen international airport.

Assignment

Studies of the technical packages, design phases.

Results

Technical files delivered for a strategic airport facility.

Scope of engagement

Assignment led by XP-NOVA's founding expert within GEQUIPS SARL — an associate company of XP-NOVA (10% of capital) and technical partner bound by a support agreement.